Dashboard Explained
The Utilisation Detail page (Resources dashboard) is a single table with one row per staff member. It shows Utilisation % next to the hours behind it: Contracted Hours, total Timesheet Hours, and the split of those hours into project, internal and leave time. When a summary dashboard raises a question about a specific person's utilisation, this is where the answer is found.
How to use it
Use Utilisation Detail when investigating a specific staff member's utilisation pattern flagged in the Heatmap or Trend view. Compare Total Project Hours against Total Hours to see how much of their recorded time was billable-project work at all, then check the Chargeable vs Non-Chargeable split within that. High Internal Hours may indicate a workload or timesheet-discipline issue worth a conversation. This page doesn't break down hours by individual project — for that level of detail, use Timesheet Detail.
Understanding your data
Column | What it shows | Calculation |
Utilisation % | Share of available time spent on client project work | Timesheet Hours | Project divided by the denominator set in your organisation’s settings: total recorded hours or Contracted Hours, with or without leave removed (same four methods as the Utilisation Trend page) |
Contracted Hours | Hours the staff member was expected to work | Non-casual chargeable staff: Hours Per Week ÷ 5 × Monday–Friday work days between employment and termination dates (public holidays not removed). Casual chargeable staff: their actual recorded hours. Non-chargeable staff: none |
Total Hours (Timesheet hours) | All time recorded | Every timesheet entry: client projects, internal projects and leave |
Total Project Hours (Timesheet Hours | Project) | Time on client projects | Time on projects not flagged as internal projects. Includes No Billing stages. This is the “utilised” time |
Chargeable (Timesheet Hours | Project | Chargeable) | Client project time on billable stages | Client project time on stages whose fee type is not No Billing |
Non-Chargeable (Timesheet Hours | Project | Non-Chargeable) | Client project time on non-billable stages | Client project time on stages with the No Billing fee type |
Internal Hours (Timesheet Hours | Internal | Ex Leave ) | Internal time other than leave | Time on internal projects, excluding stages named exactly “Leave” |
Internal Leave (Timesheet Hours | Internal | Leave) | Leave booked on timesheets | Time on internal projects, on stages named exactly “Leave” (not leave requests) |
All columns count only staff records, exclude data-import transactions, and filter by the staff member’s own office when the Office slicer is used.
What changes the numbers on this page
Control | Options (default selections) |
Approval Status buttons | Approved, Draft, Submitted (all three selected) |
Is Active | Active |
Is Casual | No |
Is Chargeable | Chargeable |
Slicers | Date, Staff Name, Week Start, Week End, Primary Rate Name, Office (active only), FY (FY2026), FY Qtr (FY2026), Month, Reports To, Team |
Fixed filters | Staff records only (Is Staff); Month Category is Current, History or Future |
Unlike Utilisation Trend, this page has no Date Hierarchy or Slice by buttons, and its FY and FY Qtr slicers default to FY2026 rather than FY2027. The same staff member can therefore show a different Utilisation % on the two pages until the date slicers match.
Notes
Chargeable versus non-chargeable depends on the stage fee type set in Synergy. “Leave” depends on the stage name being exactly “Leave”. Internal time is time against the Internal Project. Corrections to any of these are made in Synergy.
Draft and submitted time are included by default, so figures can change as timesheets are approved.
Data refreshes every 60 minutes, it's not live.